Culvert Replacement Project Roseville

Tagged Under : , ,

A major storm had washed out an access road to a local power plant.  This required our company to mobilize and start rebuilding the roadway immediately.  It was imperative the roadway be replaced  to allow  personal and emergency services access to the plant.

culvert replacement roseville

Large culvert pipe had to be installed around existing utility lines without service interruption.

 

 

 

power plant road repair roseville

 

 

 

 

 

 

All back fill material was machine compacted to ensure the roadway had a solid foundation. 

washed out culvert roseville

Finished roadway with erosion control.