Paving an off-loading facility in Sacramento. Asphalt was installed in thick “lifts” to accomidate heavy truck traffic.  This specific facility was constructed to unload lumber products. 

Unloading-facility-During-Construction
Paving in 3″ lifts was required to achieve maximum compaction of the asphalt
Team-Track-Before
Track unloading facility in Sacramento “BEFORE”
Unloading-Facility-Finished1
Unloading facility “FINISHED”