A recent accident required the local authorities to use a bike path for access. Due to the unusual heavy traffic, the bike path deteriorated. Todd Heldt Excavating & Paving was there to quickly repave the pathway and restore the area back to it’s original condition.
![Bike-Path-Paving-300x224 Bike-Path-Paving-300x224](https://paving-sacramento-ca.com/wp-content/uploads/2023/02/Bike-Path-Paving-300x224-1.jpg)
Finish paved bike path – ready for public use
![Bike-Path-Asphalt-Removal-300x224 Bike-Path-Asphalt-Removal-300x224](https://paving-sacramento-ca.com/wp-content/uploads/2023/02/Bike-Path-Asphalt-Removal-300x224-1.jpg)
The broken asphalt was removed
and hauled to a local recycling facility
and hauled to a local recycling facility