Paving an off-loading facility in Sacramento. Asphalt was installed in thick “lifts” to accomidate heavy truck traffic. This specific facility was constructed to unload lumber products.
![Unloading-facility-During-Construction](https://paving-sacramento-ca.com/wp-content/uploads/2023/02/Unloading-facility-During-Construction.jpg)
Paving in 3″ lifts was required to achieve maximum compaction of the asphalt
![Team-Track-Before](https://paving-sacramento-ca.com/wp-content/uploads/2023/02/Team-Track-Before.jpg)
Track unloading facility in Sacramento “BEFORE”
![Unloading-Facility-Finished1](https://paving-sacramento-ca.com/wp-content/uploads/2023/02/Unloading-Facility-Finished1.jpg)
Unloading facility “FINISHED”