![RAILROAD CROSSING](https://paving-sacramento-ca.com/wp-content/uploads/2023/02/RAILROAD-CROSSING-150x150-1.jpg)
The Railroad found this crossing in need of track work.
Todd Heldt Excavating & Paving removed the asphalt and exposed the track and ties to allow the railroad to complete the track repair.
After the rail was repaired, Todd Heldt Excavating & Paving repaved the crossing to allow for local traffic to use the crossing once again.
![West-Sac.-Track-Repair2- West-Sac.-Track-Repair2-](https://paving-sacramento-ca.com/wp-content/uploads/2023/02/West-Sac.-Track-Repair2-.jpg)
![West-Sacramento-Private-Crossing](https://paving-sacramento-ca.com/wp-content/uploads/2023/02/West-Sacramento-Private-Crossing.jpg)